Aanbevelen
Bestand verwijderen
Remove document <span id="remove-document-name"></span> from <span id="remove-cart-name"></span>?
Reference Report
[REF0812-0030-E]
Installation description
Process Cranes in a cement works
Country
Czech Republic
City
Radotín
Representative office
Conductix-Wampfler s.r.o. [CZ]
Operator
Českomoravský cement, a.s.
Technical requirement[s]
Main power supply to 2 Cranes
System course
Linear
Travel distance [Load]
57 m
Travel speed [Load]
60 m/min
Product[s]
Conductor Rail, Program 0812 SinglePowerLine
Quantity of poles
3 + PE
Current
400 A
Voltage
400 V
Environmental condition(s)
Very high dust loading
Single pole conductor rail preferably for straight tracks.
Special features
Main applications
Standard application data
Installation Instructions